Flat Roof Renewal
Kinsale, Co. Cork · Extension over kitchen
A ten-year-old extension roof that had held standing water since the day it was built.
- Roof area
- 38 m²
- Material
- EPDM single-ply
- Duration
- 3 days
- Project value
- €6,400 – €7,200
- Property
- Extension over kitchen
The challenge
Two previous contractors had laid new felt over the existing deck. Both failed within three years, because the deck had been built dead flat — water sat in the middle and found every joint eventually.
What we did
We stripped back to the deck and fitted tapered firrings to create a genuine 1:60 fall to a new outlet on the low side. Warm-roof insulation went in above the deck, then a single EPDM sheet bonded across the whole area with no field joints at all.
Result
Flood-tested on completion and dry through two winters. The owners have since had the kitchen ceiling replastered, which they had been putting off for six years.